Project
GEOCEAN – PROTIS – Pipe laying barge conversion
Field
–
Country
Jurong Shipyard (Singapore)
Main dimensions
Length = 120m / Beam = 33.2m
Contractor
GEOCEAN
Operator
GEOCEAN
Summary
- Barge survey
- Barge specification and general arrangement update
- Naval architecture
- Barge operability manual
- Class management (ABS)
- Yard modification follow-up
Scope of work
- Tunnel design and transom reinforcement
- Stinger and A-frame design
- Integration of pipe laying equipment and additional deck equipment
- Weight breakdown and stability booklet update
- Bilge upgrade
Engineering hours
6 000 hours
Expertise
- Naval architecture
- Platform design
- Platform T&I
- Topside T&I (Float-Over)
- SURF & pipeline design
- Pipe-laying
- SPM / CALM buoy design
- Mooring analysis
- Marine engineering
- Monitoring