Project
Hywind Scotland FOWT Pilot Farm FEED & Detailed Design Phases
Country
UK
Water depth
100m
Contractor
Olav Olsen / Aibel
Summary
Mooring System Design / 3rd Party Verification of Spar Design
Scope of work
- Integrated Load Analysis (ILA) Model Setup
- Integration of Turbine controls provided by Equinor / Siemens
- DLC matrix Definition : ULS, FLS & ALS
- Mooring system design (extreme and fatigue)
- Floater, Tower design verification (extreme and fatigue)
- Comparison and verification of ILA simulations with Company and Turbine manufacturers’ software
Software
Deeplines WindTM
Expertise
- Site Conditions Analysis
- Yield Energy ssessment
- Layout Optimization
- Integrated Load Analysis
- Turbine Load Assessment
- Foundation Design
- Mooring System Design
- Power Cable Design
- CAPEC / OPEX / LCOE
- T&I / Marine Engineering
- Monitoring
- Drawings Package